Location of Work: St. Augustine Beach Hotel, 370 A1A South, St. Augustine Beach, Florida
Scope: Reroof Spanish tile on building mansard and upper to include:
Remove single layer of existing tile (store onsite for reinstallation), underlayment, drip eave, flashings, pipe boots and venting from area complete to expose roof decking
- As needed, Install new tile that matches existing color and size as close as possible to donor area
- Inspect roof sheeting for structural damage from weather/water leakage
- Inspect exposed roof framing, fascia and furring for structural damage from weather/water leakage
- Install new Boral Tile Seal High Temp peel and stick to roof area per manufacturers specifications
- Install new aluminum flashing and drip per specifications
- Pressure clean area using chlorine solution to remove surface contaminants
- Apply Unisil HS II Silicone Roof Coating "High Solids" 50 wet mils to transition area not coated
- Reinstall ALL previously removed tile, ridge cap and accessories
- Install new Roof tile to donor area matching existing as close as possible in profile and color
- Install new Lead pipe flashing to all roof vented plumbing stacks
- Apply Mortar to all caps to match Tile color
- Install 3 new 4' alum. off ridge roof vents
- Apply 1" x 4" patty of foam ashise to each tile (Miami Dade spec)
- All fasteners associated with the new roofing material to be attached using stainless fasteners
- Assist in pedestrian & vehicular traffic safety of jobsite surroundings via posting warning signage, cones, caution tape and also flaggers and perimeter protection as deemed necessary by Contractor
- Clean and remove all debris from work area at end of each day
- Provide full time supervision during length of project
- Provide safety equipment per OSHA regulations for roof project
- Provide & file all necessary forms to obtain permit for said scope of work [this said Contractor would do in AtoZ estimate, but not sure who the contractor is]
- All debris generated by project to be remove via rubber tire dump trailer
- Include availability and timeframe to complete work
St. Johns Cultural Council to provide:
- Area for Material laydown and Staging
- Bathroom facility for roofer employees
Submission Instructions:
Proposals (Estimates) must be submitted electronically in PDF format.
Email submissions to:
Brenda Swann, Associate Director
St. Johns Cultural Council brenda@historiccoastculture.com
They must be received no later than 5:00 PM on November 4, 2022.